Skip to content
Since 2009
Pools

Living space 01

Pools

A pool that belongs to the house, not next to it.

We design the pool from the house outwards: sightlines, orientation, levels and materials. Concrete, stainless steel or monoblock, heated and covered to suit how you use it.

  • Concrete pool

    Any shape and size, finished with membrane, liner or ceramic.

  • Monoblock

    Factory-formed and quickly installed. Suited to compact gardens.

  • Indoor pool

    With ventilation, dehumidification and acoustics that protect the house.

  • Renovation

    A new finish, technology or shape for an existing pool.

Engineering & choices

What you do not see, but feel every day.

Water treatment
Salt electrolysis, UV or ozone: less chlorine, softer water.
Heating
Heat pump combined with a cover that limits heat loss.
Cover & safety
Cover under the coping or in a pit: invisible when open.
Indicative budget

Monoblock with equipment from €55,000. Concrete pools with finishes and surroundings usually between €90,000 and €220,000.

A guide price incl. VAT. Your estimate depends on site, access and finishes.

LC&DV Prijsindicaties zijn illustratief: bevestigen

Sketch your pool

Draw it in broad strokes. We’ll do the rest.

Choose a shape, slide the dimensions and watch the pool appear in plan, to scale.

Plan of a rectangular pool of 10.00 by 4.00 metres, 1.40 m deep throughout, with Belgian bluestone coping.±0.00−1.4010.00 m4.00 mN0125m
Shape

The classic shape, sized to garden and terrace.

10.00 m
4.00 m
Depth

1.40 m deep throughout

Coping

Honed and blue-grey, calm beside any facade.

Water surface
40.0 m²
Water volume
≈ 56.0 m³

Surface times the average water depth.

A sketch, not a design. The right size follows from your site, the house and the sun; we look at that together, on site.

Take this sketch along

Your sketch goes along with your request. You can still change it or leave it out there.

Completed

All projects

Frequently asked questions

All questions
How long does a concrete pool take to build?

Allow 8 to 14 weeks on site, after design and any permit.

Do I need a permit?

It depends on the region, size and position. We check for your plot and handle the application if one is needed.

What does a pool cost per year?

It depends on size, heating and cover. The concept includes an estimate of running costs.

CallEmailStart your project