

All projects
Brussels outskirts · 2024
A second life for a 1985 pool
New finish, new technology, the same shell.
- Type
- Pool
- Situation
- Renovation · Contemporary house
- Dimensions
- 9 × 4 m
- Build time
- 6 weeks
- Year
- 2024
Starting point
A concrete pool with cracked tiles, outdated filtration and high energy use.
The wish
“Keep the pool, without the maintenance and costs of before.”
The answer
The shell stayed; we fitted a reinforced membrane, new coping, a heat pump and an automatic cover.
Before and after

Photo from before the renovation
Design choices
- 01
Keep
Structural check of the shell before any choice.
- 02
Energy
Cover and heat pump replace the gas boiler.
- 03
Edge
New coping, level with the terrace.


Materials
- Sand reinforced membrane
- Ceramic coping
Engineering
- 12 kW heat pump
- Automatic cover
- New sand filter and variable pump
Have a similar project in mind?
We would be glad to talk about what is possible in your garden.

